24/7 emergency electrical service. Call 905-517-4822
A two storey house frame with scaffolding
Home / Resources / Temporary power vs generators on a build site

Temporary power vs generators on a build site

Why builders switch to utility temporary power, and what it takes.

The cost of a generator

Rental, fuel, someone's time to refuel it, noise complaints and theft risk, every day of the build.

How temporary power works

We install a temporary service on the lot or a distribution setup for a subdivision phase, and the utility connects it. Trades plug into utility power.

When to set it up

As early as possible. Utility approvals take time, so bring us in when the lot is serviced.

One contractor start to finish

The crew that installs temp power knows the site when it is time for rough in.

Ask us about your home

General information only. Every property is different; we confirm requirements on site.

Have a question?

Send it and a Fidani will reply.

Electrical emergency? Do not wait for a reply. Call 905-517-4822, 24/7. We never ask for card details in this form.