Amperage
Going from 100A to 200A is the most common job. A 400A service is a bigger job with larger equipment.
Overhead or underground
Underground services cost more because of the trench, but we dig our own, which keeps it reasonable.
Panel location
Moving the panel or meter adds wiring and wall work.
Existing wiring condition
Old wiring, double taps and unlabelled circuits add time.
Extras
Surge protection, sub panels, EV charger circuits and generator interlocks can be done in the same visit for less than doing them later.