Start with what you plan to add
A 100A service can run a typical older home with gas heat and a gas stove. It gets tight when you add an EV charger, a heat pump, a hot tub, an induction range or a basement apartment. Count what you have and what you plan to add in the next five years.
Warning signs
Breakers that trip often, lights that dim when a large appliance starts, a panel with no spare spaces, double tapped breakers, a panel brand that is no longer made, or a fuse box. Any of these is worth a call.
What a load calculation tells you
An electrician adds up your actual and planned loads using the method in the Ontario Electrical Safety Code. It answers the question with numbers instead of guesses. Sometimes the answer is that you do not need an upgrade.
What a 200A upgrade involves
A new meter base, service entrance cable, panel and grounding, an ESA permit and inspection, and a scheduled disconnect and reconnect with your utility. Most upgrades take one day on site.
General information only. Every property is different; we confirm requirements on site.